TURN YOUR STEAM INTO ENERGY SAVINGS 

BY Heliex Power-TWIN SCREW TURBINE TECHNOLOGY, UK.

Heliex Power helps steam plant owners, from cottage industry artisans to multi-nationals, unlock the potential of their waste heat and steam – enabling their businesses to prosper and do their bit in saving the planet.

Good news for Bangladesh Sustainability Managers, They can save energy by implement the new technology as bellow 2 Options. 1. Captive power generation and Steam User.  2. Captive Power generation without steam user.

  1. For Captive power generation and Steam User.

HOW OUR TST WORKS

The Heliex Power Twin Screw Turbine harnesses the power of saturated process steam and generates low-cost electricity via our patented steam screw expander technology. You then decide if you want to reuse the electricity onsite or sell it back to the grid.

If you are using steam for your production process and your boiler capacity is more than 1.5 Ton with maximum pressure 10-12 Bar or Kgs. Then Classic Industrial Service BD. giving you a fantastic offer. You can produce power by your existing steam system. You just need to install Twin screw Turbine machine in your steam line.

Currently you are using steam like bellow Boiler-Steam Header-Process/Production machine-condensate

But If we want to use the Twin screw Turbine machine then only install the machine as bellow

There is not interruption in your current steam system.  Just we will produced High pressure Steam and send to Twin screw Turbine machine inlet after power produced the machine will deliver the steam as per your process requirement. Like 7 kg/6kg/5kg/4kg/3kgs.   There is no Major loss.

So you are getting free energy and reduction Carbon for your sustainability.

 

  1. For Captive Power generation without steam user.

Currently if you are not using steam in your production process but you produced power by Generator. You have also great news from us. Then Classic Industrial Service BD has giving you a fantastic offer. You can produce power by your Generator exhaust gas. This will be co-generation in your existing power plant. You just need to install Waste heat recovery Boiler (WHRB) and Twin screw Turbine machine in your plant. It is not a big work.

Classic Industrial service BD has giving you the full support and service to supply with install the co-generation system.

If you are interested to save energy and reduction carbon footprint then contact with us without any hesitate.

Please contact with bellow address

Classic industrial Service BD.

Bagdad Tanzia tower, Tangail Road, Gazipur Chowrasta, Gazipur-1702.

Cell: 01818271791, 01764280206

Email: selim@classicindustrialservice.com, piyash@classicindustrialservice.com

Web: https://www.classicindustrialservice.com